SECRETARIAT OF THE PACIFIC COMMUNITY - KIRIBATI 

Project
In early 2016, Nuleaf was contracted to supply 4 x Lorentz Solar pumping systems, complete with Helical rotor pumps, solar panels, solar control panels, level probes, pipe and fittings. These systems where used for pumping vital drinking water on remote Islands in the Pacific Ocean. 

 

MATRIX CONSTRUCTION PNG - PORT MORESBY 

Project
In early 2016, Nuleaf was contracted to supply a sustainable and efficient, yet effective, commercial irrigation system for Matrix Construction's Air Niugini's apartment block in Port Moresby, PNG. 


Irrigation System
The irrigation system consisted of a 40mm and 32mm Pn 12.5 Ring main and 2'' Pn 8 poly laterals. Hunter MP Rotator Nozzles and Hunter PGP's installed on articulated riser assemblies fed thru Hunter 1'' PGV Solenoid Valves with individual isolation valves and controlled by Hunter I-Core Control system.

 

CAIRNS CRICKET ASSOCIATION - Endeavour Park

Project
In mid 2015, Nuleaf was contracted to design, supply and install a sustainable, efficient yet effective Commercial Sports Field Irrigation System for Cairns Cricket Association's Endeavour Park Grounds, Cairns. These works where completed and commissioned within three weeks of the start date. 

Irrigation System
Design, supply, trench, connect, test, backfill and top dress of field. 
The irrigation system consisted of a 90mm Pn 12.5 Ring main and 2'' Pn 9 poly laterals. Toro 640 Pop-ups installed on articulated riser assemblies fed thru Irritrol 2'' Solenoid Valves with individual isolation valves and controlled by Toro Decoders with Toro Decoder Controller. 

Bore Pump
Supply and install a Franklin Electric Variable Speed Drive 6 inch submersible bore pump, to supply the newly automated sports field. The bore pump was supplied with an ABB Drive, programmed to run as a constant pressure system, supply on demand. The pump was installed on 75mm Crusader Flexibore 200 rising main with associated stainless steel couplings.

 

Cairns Cricket Association - GRIFFITH'S PArk

Project
In late 2013, Nuleaf was contracted to design, supply and install a sustainable, efficient yet effective Commercial Sports Field Irrigation System for Cairns Cricket Association's Griffiths Park Grounds on Gatton Street, Cairns. These works where completed and commissioned within two weeks of the start date. 

Irrigation System
Design, supply, trench, connect, test, backfill and top dress of field. 
The irrigation system consisted of a 90mm Pn 12.5 Bore Pump Feed to field, 75mm Pn 12.5 Ring main and 2'' Pn 8 poly laterals. Hunter I-25 S/S Pop-ups installed on articulated riser assemblies fed thru Hunter 2'' PGV Solenoid Valves with individual isolation valves and controlled by Hunter Dual Decoders with Hunter I-Core Decoder Controller. 

Bore Pump
Supply and install a Franklin Electric Variable Speed Drive 6 inch submersible bore pump, to supply the newly automated sports field. The bore pump was supplied with an ABB Drive, programmed to run as a constant pressure system, supply on demand. The pump was installed on 75mm Crusader Flexibore 200 rising main with associated stainless steel couplings.

 

ST MARYS CATHOLIC COLLEGE - CAIRNS

Project
Nuleaf was contracted to design, supply and install a sustainable, efficient yet effective Commercial Sports Field Irrigation System for St Marys Catholic College on Anderson Rd, Cairns. These works where completed and commissioned within two weeks of the start date. 

Irrigation System

Design, supply, trench, connect, test, backfill and top dress of field. The irrigation system consisted of a 75mm Pn 12.5 mainline and 2'' Pn 9 poly laterals. Toro 640 Pop-ups installed on articulated riser assemblies fed thru Irritrol 2'' Solenoid Valves with individual isolation valves and controlled by Toro Decoders with Toro Decoder Controller. 

Bore Pump

Covert existing Grundfos bore pump to a variable speed constant pressure system. Thee works where completed using an ABB drive.